160kW 514kWh Deye Hybrid Energy Storage System Project in Vietnam

HBOWA provided two 80kW Deye hybrid three-phase inverters and two 257kWh high-voltage battery systems for a 160kW / 514kWh project in Vietnam.

vietnam-160kw-514kwh-energy-storage-system

Project Overview

ItemDetails
Project LocationVietnam
ApplicationEnergy Storage Project
System Capacity160kW / 514kWh
System FormatHigh-Voltage Battery Energy Storage System
Power Conversion EquipmentDeye 80kW hybrid three-phase inverters (2) and 257kWh high-voltage battery systems (2)

Customer Challenge

He was facing high electricity bills and limited power availability during periods of high demand. He wanted to use a battery storage system to reduce peak-time grid consumption, improve energy flexibility, and lower overall electricity costs.

Energy Storage Solution

We helped him analyse the detailed requirements, designed and supplied the Deye inverter and high-voltage battery system configuration.

PROCESS

How to Start Your Project with HBOWA?

Before We Quote, Tell Us 4 Things

1

Project Location & Grid

Country, grid stability, voltage, frequency, and whether grid connection or power selling is required.

2

Application Scenario

Backup power / solar storage / peak shaving / demand charge reduction / off-grid / hybrid / microgrid use.

3

Load & Energy Demand

Daily kWh use, peak power, operating hours, main loads, and whether motors or inductive loads are used.

4

Site & Special Requirements

Indoor or outdoor installation, available space, existing PV, generator, anti-backflow, EMS, or other special needs.

Send Project Details

How HBOWA Handles Your Project

1 Project Location & Grid

We first confirm where the system will be used and how it connects to the local grid.

2 Application Scenario

Define backup power, solar storage, peak shaving, off-grid, or hybrid use.

3 Load & Energy Demand

Load data helps us calculate system capacity, inverter size, backup time, and surge-load margin.

4 PV & Existing Equipment

We check whether the system needs to work with solar panels, generators, transformers, or existing equipment.

5 Installation Site
6 Solution & Quotation

After collecting project information, HBOWA prepares a practical solution and quotation.

Discuss Your Industrial Energy Storage Project with HBOWA
Discuss Your Industrial Energy Storage Project

Share your site conditions, load profile and operating goals with HBOWA.

Get Your Tailored Solar Solutions with HBOWA

Update cookies preferences
Scroll to Top