Commercial Peak Shaving BESS Project in Malaysia
HBOWA successfully installed and commissioned a 200kW / 576kWh commercial energy storage system for a local enterprise in Malaysia. The system is designed for peak shaving and load shifting, helping the customer optimize electricity usage and reduce energy costs.

Project Overview
| Item | Details |
|---|---|
| Project Location | Malaysia |
| Application | Commercial & Industrial Peak Shaving |
| System Capacity | 200kW / 576kWh |
| Battery Type | Lithium Iron Phosphate (LiFePO₄) Battery |
| Operating Mode | Grid-connected energy storage system |
| Deployment | A battery container was installed and commissioned at a local industrial facility |
Customer Challenge
The customer faced increasing electricity costs caused by high power demand during peak hours. To improve energy efficiency and reduce electricity expenses, the customer required an energy storage solution that could store electricity during lower-cost periods and supply power during peak-demand hours.
Energy Storage Solution
HBOWA provided a 200kW / 576kWh C&I energy storage system with intelligent EMS control. The energy storage system includes 36 pieces of 16kwh battery packs(314ah battery cells), for a total of 576kWh capacity, and a Megarevo MPS 200kW microgrid series hybrid inverter, air cooling system, fire extinguishing system, EMS, etc.
The system operates by:
- Charging batteries during off-peak electricity periods
- Discharging stored energy during peak demand hours
- Reducing grid power consumption during high-cost periods
- Optimizing energy usage through intelligent energy management


Project Benefits
- Lower Electricity Costs
Reduces peak-hour electricity consumption through peak shaving operation. - Improved Energy Efficiency
Optimizes electricity usage and improves overall energy management. - Reliable Power Support
Provides a stable energy supply for the customers’ industrial operations. - Safe Battery Operation
Uses LiFePO₄ battery technology with high safety and a long cycle life of over 6000 times. - Smart Energy Management
EMS enables real-time monitoring and automatic charge/discharge control through the app.
How to Start Your Project with HBOWA?
Before We Quote, Tell Us 4 Things
Project Location & Grid
Country, grid stability, voltage, frequency, and whether grid connection or power selling is required.
Application Scenario
Backup power / solar storage / peak shaving / demand charge reduction / off-grid / hybrid / microgrid use.
Load & Energy Demand
Daily kWh use, peak power, operating hours, main loads, and whether motors or inductive loads are used.
Site & Special Requirements
Indoor or outdoor installation, available space, existing PV, generator, anti-backflow, EMS, or other special needs.
How HBOWA Handles Your Project
1 Project Location & Grid
We first confirm where the cabinet system will be used and how it connects to the local grid.
2 Application Scenario
Define backup power, solar storage, peak shaving, off-grid, or hybrid use.
3 Load & Energy Demand
Load data helps us calculate cabinet capacity, PCS/ inverter size, backup time, and surge load margin.
4 PV & Existing Equipment
We check whether the storage cabinet needs to work with solar panels, generators, transformers, or existing equipment.
5 Installation Site
Confirm indoor/outdoor installation, cooling method, cable distance, and installation cost.
6 Solution & Quotation
After collecting the project information, HBOWA prepares a practical cabinet solution and quotation for you.