x
Send Your Inquiry Today
Quick Quote

250kW 1.3MWh Solis Battery Storage System for Industrial Production in Thailand

HBOWA supplied a 250kW / 1.3MWh battery storage system for industrial production use in Thailand. The project configured five Solis 50kW inverter units and the battery storage system, totaling 1.3 MWh.

Thailand 250kW 1.3MWh battery storage system

Project Overview

ItemDetails
Project LocationThailand
ApplicationIndustrial Production Load Management
System Capacity250kW / 1.3MWh
Power Conversion EquipmentFive Solis 50kW inverter units

Customer Challenge

He was experiencing high energy costs from continuous industrial production and increasing daytime electricity demand. He wanted to change the way the facility used power by storing energy for high-demand periods.

Energy Storage Solution

HBOWA analysed his situation and designed the energy storage system with five Solis 50kW inverter units and battery storage to support a more flexible energy-use strategy for his industrial site.

250kW Solis 1.3MWh battery storage system Thailand

PROCESS

How to Start Your Project with HBOWA?

Before We Quote, Tell Us 4 Things

1

Project Location & Grid

Country, grid stability, voltage, frequency, and whether grid connection or power selling is required.

2

Application Scenario

Backup power / solar storage / peak shaving / demand charge reduction / off-grid / hybrid / microgrid use.

3

Load & Energy Demand

Daily kWh use, peak power, operating hours, main loads, and whether motors or inductive loads are used.

4

Site & Special Requirements

Indoor or outdoor installation, available space, existing PV, generator, anti-backflow, EMS, or other special needs.

Send Project Details

How HBOWA Handles Your Project

1 Project Location & Grid

We first confirm where the system will be used and how it connects to the local grid.

2 Application Scenario

Define backup power, solar storage, peak shaving, off-grid, or hybrid use.

3 Load & Energy Demand

Load data helps us calculate system capacity, inverter size, backup time, and surge-load margin.

4 PV & Existing Equipment

We check whether the system needs to work with solar panels, generators, transformers, or existing equipment.

5 Installation Site
6 Solution & Quotation

After collecting project information, HBOWA prepares a practical solution and quotation.

Discuss Your Industrial Energy Storage Project with HBOWA
Discuss Your Industrial Energy Storage Project

Share your site conditions, load profile and operating goals with HBOWA.

Get Your Tailored Solar Solutions with HBOWA

Update cookies preferences
Scroll to Top