375kW 723kWh Solis Energy Storage System for Commercial Use in Indonesia

HBOWA supplied a 375 kW 723 kWh energy storage configuration for commercial use in Indonesia. The supplied project materials include three 125kW Solis units, three 241kWh energy storage systems, and the AC box.

indonesia-375kw-723kwh-energy-storage-system

Project Overview

ItemDetails
Project LocationIndonesia
ApplicationCommercial Backup Power
System Capacity375kW / 723kWh
Power Conversion EquipmentThree Solis 125kW units and three 241kWh energy storage systems

Customer Challenge

He needed a more reliable power supply for commercial operations because grid interruptions could affect normal business activities. He also wanted to reduce electricity costs and use battery-stored energy to support critical loads when needed.

Energy Storage Solution

We customized the battery storage solutions for him. The modular configuration combined three Solis 125kW units with three 241 kWh high-voltage battery pack systems. It was prepared for the commercial site using the supplied AC box and storage-system layout.

Project Benefits

  • Commercial Power Support
    Battery storage provides an additional energy source for the site.
  • Energy-Cost Management
    Stored energy can help change when the site draws electricity from the grid.

125KW SOLIS

AC BOX1. 375KW- 723KWH

PROCESS

How to Start Your Project with HBOWA?

Before We Quote, Tell Us 4 Things

1

Project Location & Grid

Country, grid stability, voltage, frequency, and whether grid connection or power selling is required.

2

Application Scenario

Backup power / solar storage / peak shaving / demand charge reduction / off-grid / hybrid / microgrid use.

3

Load & Energy Demand

Daily kWh use, peak power, operating hours, main loads, and whether motors or inductive loads are used.

4

Site & Special Requirements

Indoor or outdoor installation, available space, existing PV, generator, anti-backflow, EMS, or other special needs.

Send Project Details

How HBOWA Handles Your Project

1 Project Location & Grid

We first confirm where the system will be used and how it connects to the local grid.

2 Application Scenario

Define backup power, solar storage, peak shaving, off-grid, or hybrid use.

3 Load & Energy Demand

Load data helps us calculate system capacity, inverter size, backup time, and surge-load margin.

4 PV & Existing Equipment

We check whether the system needs to work with solar panels, generators, transformers, or existing equipment.

5 Installation Site
6 Solution & Quotation

After collecting project information, HBOWA prepares a practical solution and quotation.

Discuss Your Industrial Energy Storage Project with HBOWA
Discuss Your Industrial Energy Storage Project

Share your site conditions, load profile and operating goals with HBOWA.

Get Your Tailored Solar Solutions with HBOWA

Update cookies preferences
Scroll to Top