500kW 1MWh Megarevo Battery Storage System Project in Vietnam

HBOWA supplied a 500 kW, 1 MWh battery storage system for a microgrid project in Vietnam. The total supplied system includes the high-voltage LiFePO4 battery system, Megarevo MPS equipment, and data monitoring system.

vietnam-500kw-1mwh-battery-storage-system

Project Overview

ItemDetails
Project LocationVietnam
ApplicationMicrogrid and Weak-Grid Power Support
System Capacity500kW / 1MWh
Power Conversion EquipmentMegarevo MPS power conversion equipment

Customer Challenge

He was dealing with insufficient and unstable grid power, while electricity costs remained high. He needed a flexible energy-storage solution to improve power availability, reduce dependence on costly grid electricity.

Energy Storage Solution

The project uses a 500kW Megarevo configuration with a 1MWh battery storage system. The supplied materials show system debugging, data monitoring, and the EMS system diagram for the project.

Project Benefits

  • Power Availability Support
    Energy storage provides an additional power source for the customer’s site.
  • Data Monitoring
    The data monitoring system helped him to manage the power system efficiently and made it easy for him to debug.
  • Flexible Energy Use
    Battery storage supports a more flexible approach to the grid.
PROCESS

How to Start Your Project with HBOWA?

Before We Quote, Tell Us 4 Things

1

Project Location & Grid

Country, grid stability, voltage, frequency, and whether grid connection or power selling is required.

2

Application Scenario

Backup power / solar storage / peak shaving / demand charge reduction / off-grid / hybrid / microgrid use.

3

Load & Energy Demand

Daily kWh use, peak power, operating hours, main loads, and whether motors or inductive loads are used.

4

Site & Special Requirements

Indoor or outdoor installation, available space, existing PV, generator, anti-backflow, EMS, or other special needs.

Send Project Details

How HBOWA Handles Your Project

1 Project Location & Grid

We first confirm where the system will be used and how it connects to the local grid.

2 Application Scenario

Define backup power, solar storage, peak shaving, off-grid, or hybrid use.

3 Load & Energy Demand

Load data helps us calculate system capacity, inverter size, backup time, and surge-load margin.

4 PV & Existing Equipment

We check whether the system needs to work with solar panels, generators, transformers, or existing equipment.

5 Installation Site
6 Solution & Quotation

After collecting project information, HBOWA prepares a practical solution and quotation.

Discuss Your Industrial Energy Storage Project with HBOWA
Discuss Your Industrial Energy Storage Project

Share your site conditions, load profile and operating goals with HBOWA.

Get Your Tailored Solar Solutions with HBOWA

Update cookies preferences
Scroll to Top