MPS250kw 800kwh BESS Backup Power in Nigeria
HBOWA supplied a 250kW / 800kWh battery storage system for a backup power project in Nigeria. The system is equipped with a Megarevo MPS 250kW unit and is designed to provide stable power support during grid outages. With 800kWh battery capacity, the BESS system can support critical loads for a longer backup duration.
Project Overview
| Item | Details |
|---|---|
| Project Location | Nigeria |
| Application | Backup Power Energy Storage |
| System Capacity | 250kW / 800kWh |
| Battery Type | High Voltage LiFePO₄ Battery Storage System |
| PCS / Inverter | Megarevo MPS 250kW |
| Operating Mode | Backup power + energy storage support |
| Deployment | Installed for commercial backup power use |
Customer Challenge
The customer needed a stable power solution to reduce the impact of power interruptions. Frequent outages can affect business operations, equipment safety, and daily electricity use. Traditional diesel generators can provide backup power, but fuel cost, noise, maintenance, and long-term operating expenses are his major concerns. He required a green cleaner and a more reliable battery backup system.

Energy Storage Solution
HBOWA provided a 250kW / 800kWh high voltage battery storage system with a Megarevo MPS 250kW unit according to his load’s electricity needs. After installation, the system can support important loads such as lighting, office equipment, communication systems, refrigeration, and other electrical loads. When the grid is available, the battery can stay charged and ready for backup operation. During a grid outage, the system discharges stored energy to keep key loads running.
Project Benefits
- Reliable Backup Power
Provides stored energy when grid power is unavailable. - Large Battery Capacity
800kWh storage supports longer operation for important loads. - Reduced Diesel Dependence
Helps reduce diesel fuel use, noise, and maintenance needs. - High Voltage System Design
Suitable for large backup power applications.
How to Start Your Project with HBOWA?
Before We Quote, Tell Us 4 Things
Project Location & Grid
Country, grid stability, voltage, frequency, and whether grid connection or power selling is required.
Application Scenario
Backup power / solar storage / peak shaving / demand charge reduction / off-grid / hybrid / microgrid use.
Load & Energy Demand
Daily kWh use, peak power, operating hours, main loads, and whether motors or inductive loads are used.
Site & Special Requirements
Indoor or outdoor installation, available space, existing PV, generator, anti-backflow, EMS, or other special needs.
How HBOWA Handles Your Project
1 Project Location & Grid
We first confirm where the cabinet system will be used and how it connects to the local grid.
2 Application Scenario
Define backup power, solar storage, peak shaving, off-grid, or hybrid use.
3 Load & Energy Demand
Load data helps us calculate cabinet capacity, PCS/ inverter size, backup time, and surge load margin.
4 PV & Existing Equipment
We check whether the storage cabinet needs to work with solar panels, generators, transformers, or existing equipment.
5 Installation Site
Confirm indoor/outdoor installation, cooling method, cable distance, and installation cost.
6 Solution & Quotation
After collecting the project information, HBOWA prepares a practical cabinet solution and quotation for you.