100kW 500kWh Self-Consumption ESS in Bohol Philippines
HBOWA supplied a 100kW / 500kWh energy storage system for a solar self-consumption project in Bohol, Philippines. The system uses two 50kW Deye hybrid inverters together with 500kWh battery storage, helping the customer improve solar energy utilization and maintain a stable local power supply on the island.

Project Overview
| Item | Details |
|---|---|
| Project Location | Bohol, Philippines |
| Application | Island Solar Self-Consumption Energy Storage |
| System Capacity | 100kW / 500kWh |
| Inverter | 2 × 50kW Deye Hybrid Inverters |
| Battery Capacity | 500kWh |
| Operating Mode | Solar self-use + battery storage |
| Deployment | Installed for an island self-consumption power project |
Customer Challenge
The customer needed a stable and efficient energy solution for island power use. In island areas, electricity supply can be less stable, and solar power without storage cannot fully cover power demand during evening hours or low-generation periods. He wanted to improve solar self-consumption and reduce reliance on external power sources.
Energy Storage Solution
HBOWA provided a 100kW / 500kWh battery energy storage system with two 50kW Deye hybrid inverters connected in parallel, and 500kwh high voltage battery in racks.
The system supports:
- Direct solar self-consumption
- Battery storage of excess daytime solar power
- Power supply during nighttime or low-solar periods
- Stable load support for island applications
- Intelligent coordination between PV, battery, and load
Project Benefits
- Higher Solar Utilization
Stores excess solar power in 500kwh battery for later use. - Stable Island Power Supply
Supports daily electricity demand with battery backup. - Lower Dependence on External Power
Improves local energy self-sufficiency as a power backup system. - Flexible Hybrid Operation
Two 50kW Deye hybrid inverters provide stable system operation. - Suitable for Island Applications
Works well for self-use power systems in the island locations.
How to Start Your Project with HBOWA?
Before We Quote, Tell Us 4 Things
Project Location & Grid
Country, grid stability, voltage, frequency, and whether grid connection or power selling is required.
Application Scenario
Backup power / solar storage / peak shaving / demand charge reduction / off-grid / hybrid / microgrid use.
Load & Energy Demand
Daily kWh use, peak power, operating hours, main loads, and whether motors or inductive loads are used.
Site & Special Requirements
Indoor or outdoor installation, available space, existing PV, generator, anti-backflow, EMS, or other special needs.
How HBOWA Handles Your Project
1 Project Location & Grid
We first confirm where the cabinet system will be used and how it connects to the local grid.
2 Application Scenario
Define backup power, solar storage, peak shaving, off-grid, or hybrid use.
3 Load & Energy Demand
Load data helps us calculate cabinet capacity, PCS/ inverter size, backup time, and surge load margin.
4 PV & Existing Equipment
We check whether the storage cabinet needs to work with solar panels, generators, transformers, or existing equipment.
5 Installation Site
Confirm indoor/outdoor installation, cooling method, cable distance, and installation cost.
6 Solution & Quotation
After collecting the project information, HBOWA prepares a practical cabinet solution and quotation for you.