300kW 400kWh Off Grid Energy Storage in Togo
HBOWA successfully delivered a 300kW PV + 400kWh off-grid energy storage system to Togo, West Africa, and put it into operation. The system is designed to provide stable electricity for local no-grid areas. With solar generation, battery storage, and intelligent energy management, the project helps local users reduce diesel generator dependence and improve electricity reliability.

Project Overview
| Item | Details |
|---|---|
| Project Location | Togo, West Africa |
| Application | Off-Grid Solar Battery Storage |
| System Capacity | 300kW PV + 400kWh Battery Storage |
| Operating Mode | Solar generation + battery storage + off-grid power supply |
| Deployment | Delivered and officially put into operation |
Customer Challenge
The local customer needed a reliable power solution for the area with no grid access in Togo. Diesel generators could provide electricity, but fuel cost, maintenance, noise, and long-term operating expenses were his major concerns. He required a cleaner and more stable energy system that could operate under West Africa’s high-temperature and high-solar-radiation environment.
Energy Storage Solution
HBOWA customizes the energy power system for him; the project uses a 300kW solar PV system combined with 400kWh battery energy storage. Solar power supplies the load during the day, while excess energy is stored in the battery system for nighttime and rainy days.
Project Benefits
- 24-Hour Power Supply
Supports continuous electricity supply through PV and battery storage. - Reduced Diesel Dependence
Replaces part of the diesel generator use. - Stable Off-Grid Operation
Provides reliable power for areas without a stable grid connection. - Adapted to Local Climate
Suitable for West Africa’s high-temperature and high-irradiation environment. - Clean Energy Use
Helps local users access more sustainable and cost-effective electricity.
How to Start Your Project with HBOWA?
Before We Quote, Tell Us 4 Things
Project Location & Grid
Country, grid stability, voltage, frequency, and whether grid connection or power selling is required.
Application Scenario
Backup power / solar storage / peak shaving / demand charge reduction / off-grid / hybrid / microgrid use.
Load & Energy Demand
Daily kWh use, peak power, operating hours, main loads, and whether motors or inductive loads are used.
Site & Special Requirements
Indoor or outdoor installation, available space, existing PV, generator, anti-backflow, EMS, or other special needs.
How HBOWA Handles Your Project
1 Project Location & Grid
We first confirm where the cabinet system will be used and how it connects to the local grid.
2 Application Scenario
Define backup power, solar storage, peak shaving, off-grid, or hybrid use.
3 Load & Energy Demand
Load data helps us calculate cabinet capacity, PCS/ inverter size, backup time, and surge load margin.
4 PV & Existing Equipment
We check whether the storage cabinet needs to work with solar panels, generators, transformers, or existing equipment.
5 Installation Site
Confirm indoor/outdoor installation, cooling method, cable distance, and installation cost.
6 Solution & Quotation
After collecting the project information, HBOWA prepares a practical cabinet solution and quotation for you.